Pre-Feasibility Studies Surat Basin
Larpro coordinated and compiled two Pre-Feasibility Studies for Cockatoo Coal for the Taroom and Collingwood sites in the Surat Basin, Queensland, incorporating mining studies performed by others as well as undertaking infrastructure designs and estimates. Additionally, Larpro managed various sub consultants for geotechnical studies, hydrological studies and CHPP design.
Financial modelling for the life of mine was also undertaken by Larpro to assist in determining project viability across a number of scenarios.